Prospects
open to expressions of interest





REDCASTLE - BETTY & LLOYD PROJECT


Murrin Murrin, Western Australia

  • Total Project Area 77.5 sq. kilometres
  • Project Area is 30kms SW of Dacian Gold's Mt Morgans/Jubilee Project (Resource of 3.2M ounces in 2016)
  • Project area is 45kms WSW of the Wallaby and Granny Smith Gold Mines ( Resource  of 6.5M ounces (31/12/2016)).
  • Project is 50kms WNW of Sunrise Dam ( Resource of 5.7 M ounces (31/12/2016)).
  • 1800 line km at 50m line spacings of ground magnetic survey completed using  two Gem  GSMP35 Magnetometers (purchased new December 2016)
  • Ground survey was carried out by a geologist, ex Glencor (Murrin Murrin) previously ore body modelling at Murrin Murrin.
  • Interpretation of ground magnetics by Southern Geoscience Consultants delineating numerous targets and fault structures
  • Soil Geochemistry programmes by Goldfields Exploration produced targets in existing tenement area.
  • Synite Granites mapped in project area
  • Extensive old workings in the Betty & Lloyd /Windsor Well area including the Bendigo Group of Mines and other workings in  older GMLs'.
  • Significant NW corridor of old workings and recent alluvial workings.
  • Redcastle tenements are immediately north of the historic Redcastle mining area and alluvial gold patches from scrape and detect methods are common where  quartz reefs exist.

Back

Ph: 08 9021 1790
Fax: 08 9021 1920


copyright © 2012 Prospect Promotions
1 Roberts Street,
Kalgoorlie,
WA 6430

Last Updated: 03 Mar 2019 Visitors since 24 June 2012: 41468